More=> liang360.com | pv-sources.com | Equipments | Job | BBS | Willkommen | Willkommen | Willkommen | Willkommen | Willkommen | Willkommen
| WAP Ansichten | RSS Bestellung
Mitglieder Center
Center
Mitteilung Informationen
Mitteilung
Listebekanntmachung
Rang
 
Aktuelle Position: Home » News » Aktuelle Nachrichten » Text

The sun power finish widely nuclear tin iron mountain 60 mw photovoltaic inverter supply task

Zeichen vergroessen  Zeichen verkleinern Date:2011-08-17   Ansichten:31

Early August, with the final batch of 500 KW photovoltaic inverter delivery, and the sun power Co., LTD with wide in qinghai tin iron mountain nuclear project 60 mw photovoltaic inverter has all delivery.

Wide of the construction of the nuclear investment in power station is located in qinghai province iron mountain tin qaidam basin, average elevation 3050 meters, sunshine is rich in resources, land leveling is wide, and has convenient access network conditions. According to the supply agreement for the power station, the sun power supply second phase, and the third phase project provides 60 mw of SunAccess series large photovoltaic inverter. This is the first demonstration franchise China photovoltaic power station dunhuang project, both sides-after another in hand cooperation.

As the sun's power of main products, SunAccess series high-power inverter reliable quality, excellent performance and have made T? V, CE, ETL, AS4777, "gold sun" and so on many of the products of domestic and international authoritative authentication, are widely used in Shanghai, Beijing and Shanghai world expo Shanghai hongqiao station, high iron western several desert power station and so many large photovoltaic power projects, and batch export to Europe. After the two sides of the cooperation in China's first photovoltaic franchise in the project subject to tender, series of inverter in the conversion efficiency and power quality, wide range of temperature adaptability of comprehensive index excellent performance, and stable and reliable performance, professional, timely, and considerate technical service, all won wide in nuclear recognition.

DuoNian to power has been committed to the sun, for clients to provide global first-class renewable power generation equipment and professional technical service and focus on the solar power for the development and application of the core equipment, and has now grown for Chinese renewable power generation equipment, leader of the enterprise. The power of nuclear construction wide in qinghai iron mountain tin mass photovoltaic power station, the sun power will continue to play professional skill, and ensure the quality of service, the late for power station smooth by nets provide strong technical support.

 
 
[ NewsSuchen ]  [ ]  [ den Freunden Bescheid sagen ]  [ Print ]  [ Fenster schließen ]  [ Top ]

 
insgesamt0Anzahl [Ansicht Alle]  relevante Kommentare

 
Empfohlene Texte und Bilder
empfehlenswertNews
Klickenliste
 
 
Home | Copyright Datenschutz | Nutzungsvereinbarung | Kontakt | über uns | Site Map | Links | Site Kommentare | Werbung | LED技术论坛 | 照明技术论坛 | 光电技术论坛 | LED展会 | LED china | china LED | LED灯出口德国 | LED灯出口西班牙 | LED灯出口阿拉伯 | LED灯出口东欧 | LED灯出口美国 | LED灯出口
über uns
Powered by Liang360